Friday, 11 December 2009

First filming day continued

After we filmed the cars on the A2 we went back to school to film the next part of the title sequence; the graph. First we had to create the graph on PowerPoint. Here is what we produced below.























We made the graph on PowerPoint and made the graph line have a custom animation so that when the mouse was clicked it expanded. This can be seen in the shots which we took below.





Here is the first shot we took of the animated graph. As you can see from the shot that we took it was not of good quality. The camera was not kept still on the tripod which had an impact on the overall quality. Also the camera was too zoomed in as the axis figures could not be seen. Also the camera was not in line correctly with the screen. So we had to film the shot again ensuring that we did not encounter the same problems.


We made sure that the camera was in line with the screen correctly and that the graph figures could be clearly seen. The shot was of good quality and the previous problems were solved, obviously we would cut out the first part of the clip but apart from that the clip was ready to be placed in the title sequence.

No comments:

Post a Comment